Buyer Resource
Rack RFQ Template
Use this rack RFQ template to describe the part, supports, loading direction and factory route before requesting a custom rack quotation. Add quantity, destination and sample requirements so suppliers can compare the same configuration.

Configuration views
Supporting views for the rack RFQ template buying and approval task.


Configuration comparison
Compare rack rfq template decisions
Use the actual part, route and approval requirement to compare options before a supplier fixes the layout.
| Configuration | Use it when | Main trade-off | Send with the RFQ |
|---|---|---|---|
| Part data | Required before contact and structural decisions can be finalized. | This choice changes the configuration and must be checked against drawing/cad/sample, revision, mass, centre of gravity. | Drawing/CAD/sample, revision, mass, centre of gravity |
| Process data | Required to define access and interfaces. | This choice changes the configuration and must be checked against loading method, route and equipment. | Loading method, route and equipment |
| Return data | Required to evaluate folding, nesting or stack/return state. | This choice changes the configuration and must be checked against empty-return method and transport envelope. | Empty-return method and transport envelope |
From requirement to quotation
Rack RFQ Template project workflow
Keep the source inputs, concept and release steps connected so procurement compares like-for-like proposals.
- 1
Attach the controlled part input
Identify the part revision and provide the best available drawing, CAD or sample data.
- 2
Describe the real material flow
Record loading, handling, storage, transport, unloading and empty return.
- 3
List project controls
Add finish, label, inspection, validation and approval requirements.
- 4
Flag every unknown
Assign unresolved inputs to the buyer, equipment supplier or engineering review.
- 5
Submit for feasibility review
Send the completed checklist and attachments before requesting a final project quotation.
Copy into your RFQ
Use the following headings and attach controlled files where available.
- Part: name, revision, drawing/CAD/sample, mass and centre of gravity
- Pack: quantity, orientation, contact map and dunnage restrictions
- Handling: fork/AGV/conveyor/crane/manual interfaces and loading sequence
- Route: loaded storage/transport, stacking and empty return
- Environment: indoor/outdoor, contamination, cleaning and finish requirement
- Control: labels, critical dimensions, inspection and validation evidence
- Commercial: quantity, destination, incoterm request and schedule target
Mark unknowns explicitly
Use `TBC by buyer`, `TBC with equipment supplier` or `engineering review required`. This keeps an assumption from becoming an uncontrolled specification.
RFQ completeness check
Use these points to prepare your part drawing, handling details and sample checks for a useful supplier quotation.
| Decision | Guidance | Buyer input |
|---|---|---|
| Part data | Required before contact and structural decisions can be finalized. | Drawing/CAD/sample, revision, mass, centre of gravity |
| Process data | Required to define access and interfaces. | Loading method, route and equipment |
| Return data | Required to evaluate folding, nesting or stack/return state. | Empty-return method and transport envelope |
| Acceptance data | Required to plan sample and production release. | Critical checks, records and approver |
Send the completed RFQ inputs
Attach controlled drawings or samples and identify unresolved points for engineering review.
Send drawings or requirementsRack RFQ Template — Frequently Asked Questions
What information should I provide for rack RFQ template?+
A useful rack RFQ includes the part drawing or sample, mass and centre of gravity, quantity per rack, contact restrictions, loading sequence, handling equipment, loaded and empty-return states, environment and finish, labels, inspection/validation requirements, order quantity, destination and required commercial terms. Unknown values should be marked for review, not guessed. Include the controlled source files, required quantity, destination and the person or team approving the project inputs.
Which decision should be made first for rack rfq template?+
Required before contact and structural decisions can be finalized. Start with drawing/cad/sample, revision, mass, centre of gravity so later layout and quotation decisions use the same baseline.
How does the handling route affect the proposed solution?+
Each loading, transfer, storage, line-side and empty-return state can change access, clearances and equipment interfaces. Describe the complete route and attach equipment drawings where an interface must match.
Can HAOFU quote from photos alone?+
Photos can start a feasibility discussion, but a useful project quote also needs the controlled part or load data, handling method, required quantity and destination. Mark any unresolved input for engineering review instead of estimating it.
What should be checked before production release?+
Send the completed checklist and attachments before requesting a final project quotation. The buyer and supplier should use the agreed drawing revision and visible acceptance criteria.
How do I request a project-specific proposal?+
Attach controlled drawings or samples and identify unresolved points for engineering review. Use the linked RFQ route to send drawings, photos and requirements for review.
