Custom-Engineered DesignBuilt for Your Components
Strong & Reusable StructureReliable for Long-Term Use
Efficient Material HandlingFaster Storage & Transport
Custom-Engineered DesignBuilt for Your Components
Strong & Reusable StructureReliable for Long-Term Use
Efficient Material HandlingFaster Storage & Transport
Custom-Engineered DesignBuilt for Your Components
Strong & Reusable StructureReliable for Long-Term Use
Efficient Material HandlingFaster Storage & Transport

Buyer Resource

Rack RFQ Template

This rack RFQ template helps buyers organize the inputs a manufacturer needs to scope a custom steel rack. It is a web checklist, not a substitute for a controlled drawing, engineering review or project-specific validation plan.

Direct answer

A useful rack RFQ includes the part drawing or sample, mass and centre of gravity, quantity per rack, contact restrictions, loading sequence, handling equipment, loaded and empty-return states, environment and finish, labels, inspection/validation requirements, order quantity, destination and required commercial terms. Unknown values should be marked for review, not guessed.

Rack specification and RFQ review for a custom steel carrier
Relevant HAOFU product or process image. Final configuration and acceptance criteria remain project-specific.

Copy into your RFQ

Use the following headings and attach controlled files where available.

  • Part: name, revision, drawing/CAD/sample, mass and centre of gravity
  • Pack: quantity, orientation, contact map and dunnage restrictions
  • Handling: fork/AGV/conveyor/crane/manual interfaces and loading sequence
  • Route: loaded storage/transport, stacking and empty return
  • Environment: indoor/outdoor, contamination, cleaning and finish requirement
  • Control: labels, critical dimensions, inspection and validation evidence
  • Commercial: quantity, destination, incoterm request and schedule target

Mark unknowns explicitly

Use `TBC by buyer`, `TBC with equipment supplier` or `engineering review required`. This keeps an assumption from becoming an uncontrolled specification.

RFQ completeness check

Use this matrix to identify required project inputs. It does not publish universal dimensions, load ratings or tolerances.

DecisionGuidanceBuyer input
Part dataRequired before contact and structural decisions can be finalized.Drawing/CAD/sample, revision, mass, centre of gravity
Process dataRequired to define access and interfaces.Loading method, route and equipment
Return dataRequired to evaluate folding, nesting or stack/return state.Empty-return method and transport envelope
Acceptance dataRequired to plan sample and production release.Critical checks, records and approver

Project workflow

  1. 1

    Attach the controlled part input

    Identify the part revision and provide the best available drawing, CAD or sample data.

  2. 2

    Describe the real material flow

    Record loading, handling, storage, transport, unloading and empty return.

  3. 3

    List project controls

    Add finish, label, inspection, validation and approval requirements.

  4. 4

    Flag every unknown

    Assign unresolved inputs to the buyer, equipment supplier or engineering review.

  5. 5

    Submit for feasibility review

    Send the completed checklist and attachments before requesting a final project quotation.

Send the completed RFQ inputs

Attach controlled drawings or samples and identify unresolved points for engineering review.

Send drawings or requirements